The Riverfront Expressway: For more than twenty years, highway planners wanted an elevated expressway along the river in front of Jackson Square. In 1969 the federal government cancelled it, the first segment of the Interstate system ever killed to protect a historic district. The people who stopped it never argued that the port didn't matter. They argued that some of what this city owns is not freight.
I sit in the third row with my ankles crossed and the Argentum application file flat across my knees. I've checked the drawings, photographs, and structural reports twice, and the krewe's board has given me authorization to speak on its behalf.
I've been over the agenda twice, once at my kitchen table last night after Ridge went down and once in the car when I got here. The Thibodaux Press House caught my attention immediately, because I know it's Robert's project.
It's item four, listed under Thibodaux Property Holdings LLC, and Argentum is item seven.
I'm glad Robert is finally moving forward with the restoration. I wonder who he's hired to present the application. Whoever it is, I hope they know what they're doing. That building could be stunning if it's done right.
I've attended dozens of these meetings between my internships and Colcock & Ames, but this is the first time I'm representing a project entirely on my own. If the commission has questions, there isn't anyone sitting beside me to answer them.
The room holds about forty people. There are architects with rolled drawings under their arms, a few lawyers, and property owners in sport coats that don't fit well enough for court but fit well enough for a hearing.
Five commissioners sit behind a long oak table on a riser. Commissioner Beaumont occupies the center chair, his reading glasses low on his nose, a legal pad open in front of him.
The first three items move quickly. A roof replacement gets approved, a paint-color dispute takes longer than it should, and Beaumont tables a demolition request because the applicant forgot photographs of the rear elevation.
"Item four. COA application 95-0312. Thibodaux Press House, 614 Tchoupitoulas Street. Applicant: Thibodaux Property Holdings LLC."
I open my file to the tab I made for the press house docket sheet. I pulled it two weeks ago when the agenda posted, curious to see what they're planning.
The door at the back of the hearing room opens, and Robert walks in with a man I don't recognize, carrying a roll of drawings. I look up from my file, surprised to see Robert here. I expected a consultant at the podium, not Robert himself.
Robert makes his way to the podium in a charcoal suit and white shirt with no tie. The jacket fits him across his broad shoulders, and there's a day's worth of stubble along his jaw.
God, he looks good in a suit.
His hands are empty. Earl follows with the plans.
He doesn't look my way. I'm three rows back, with two men seated between me and the aisle. His attention is already on Beaumont.
"Mr. Stone, describe the proposed scope of work."
Robert steps closer to the microphone.
"The east elevation gets repointed first."
My pen stops moving.
"Water's been entering through deteriorated mortar joints. The brick is sound, but the mortar's failed. We're matching the original lime putty mix, not Portland."
"Is that the full scope on exterior walls?" One of the men asks.
"Nothing inside gets touched until that wall is corrected. Otherwise we trap moisture behind new finishes."
I set my pen down.
"The plywood infill from the sixties comes out. Subfloor gets assessed before anyone refinishes anything. The original heart pine stays."
I can't help smiling. He even remembered the heart pine.
He rolls through every single thing I told him when we walked through there in November, almost verbatim. He wasn't taking notes, but he remembered everything. I'm impressed.
A commissioner at the end, a woman with short gray hair and reading glasses on a chain, leans forward.
"Mr. Stone, who is your preservation consultant on this project?"
Robert doesn't pause or look around the room.